Case Studies

Weatherite 'Wellcomed' to Hinxton Hall
PROJECT Weatherite Building Services (WBS) has recently undertook a major programme to refurbish and replace air handling units (AHUs) at Hinxton Hall, the Wellcome Trust’s famous
» Read The Full Story
Heat Reclamation Solution For A Retail Superstore
To design and manufacture a product to satisfy the heating and cooling requirements for the retail superstore, whilst incorporating high grade heat recovery from the food refrigeration plant. Weather
» Read The Full Story
Weatherite Prime Contracts Retail Air Conditioning Replacement
To replace the existing rooftop packaged cooling equipment on a retail superstore. The equipment had reached the end of its working life and the project required minimal disruption to trading
» Read The Full Story
Downflow Cooling For Cable & Wireless
To design, manufacture and commission fully packaged direct expansion in room free cooling units to provide cooling to Cable & Wireless telecommunications switching centres. The well esta
» Read The Full Story
Packaged Heat Pump Implementation For J. Sainsbury, Bath
To design, manufacture and commission a direct replacement rooftop packaged heat pump as part of the J. Sainsbury store refurbishment programme. Weatherite carried out a survey of the site in
» Read The Full Story
Heat Recovery Systems For Tesco Stores
To design and manufacture a product to satisfy the heating and cooling requirements for the store, whilst incorporating high grade heat recovery from the food refrigeration plant. Weatherite worked c
» Read The Full Story
High Efficiency Fan Technology Royal Victoria Centre
The existing air conditioning equipment for the busy Royal Victoria Shopping Centre in Tunbridge Wells was provided by a number of remote units, each of which had come to the end of its useful
» Read The Full Story
Air Handling Units For Havering Magistrates Court
The building services and roof of Havering Magistrates Court were in need of major refurbishment, with the strict proviso that normal court procedures were in no way affected by any repair wor
» Read The Full Story
Replacement Air Conditioning Unit At The M&S Bath Store
The existing rooftop air conditioning unit at the Marks & Spencer store in Bath was over 15 years old, worn out, inefficient and ineffective. However, the ductwork, controls, electrics, etc
» Read The Full Story
Rooftop air conditioning at M&S Cheshunt store
As part of their partnering approach, Weatherite Group of companies supplied and installed a new state of the art air conditioning system at Marks & Spencer’s Cheshunt store in Hertfordshire
» Read The Full Story








